Hill Phoenix P074749F 用户手册

下载
页码 32
I
NSTALLATION
MOVING CASES
Hill PHOENIX display cases are generally shipped to stores 
with casters installed on the base frame.  The casters make the 
job of moving cases easier for everyone involved in the ship-
ping and installation process, as well as reducing the chance of 
damage from raising and lowering cases with ”J” bars to place 
them on dollies, skates or rollers.  In most situations, one or two 
persons can easily move the case into position.
When the cases arrive at the store, simply roll them on to the 
store fl oor to the proper staging area.  Occasionally, cases are 
shipped with skid boards attached to help with stabilization.  In 
these instances, the casters should be attached after the case is 
removed from the truck. 
Removing the casters is an easy process.  Simply fl atten and 
remove the cotter pins that are holding the casters in place (see 
Fig. 1).  Then lift the case with a “J” bar and slide the caster 
assemblies out.  The dismantled casters can now be discarded.
     
W A R N I N G
Be certain that your hands and feet are out of the way 
before lowering the case after the removal of the cast-
ers.  Failure to do so may result in serious injury.
FLOOR PREP
1. 
Ask the general contractor if there have been changes in 
the building dimensions since the print you are using was 
issued.  Also, ask for the points of reference from which 
you should take dimensions to locate the cases.
2. 
Using chalk lines or a laser transit, mark the fl oor where 
the cases are to be located for the entire lineup.  The lines 
should coincide with the outside edges of the base frame.
3. 
Leveling is necessary to ensure proper case alignment and 
to avoid potential damage.  Locate the highest point on the 
positioning line as a reference for determining the proper 
height of the shim-pack levelers.  A laser transit is recom-
mended for precision and requires just one person.
4. 
Locate the position of the base frame and spot properly lev-
eled shim packs at the appropriate locations.
LINE-UP & INSTALLATION
1. 
Remove anything from the cases that may interfere with 
case joining (eg. shipping braces). 
2. 
Roll the fi rst case into position.  Using a “J” bar , raise the 
end of the case (under cross support), remove the casters, 
and place the base frame on the shim packs.  Repeat on the 
other end of the case.
3. 
Once the base frame is properly placed on the shim packs, 
check the vertical level by placing a bubble level plumb to 
the rear edge of the case; then add/remove shim levels as 
needed.  To check the horizontal level, repeat this process 
after placing the bubble level on the rear sill.
TRIM OUT
Attach the front kick plate to the retainer using the screws 
provided.  To attach the end kick plates, slide them under the 
case ends, thread the hanging connector tabs into the provided 
slots, then drop the kick plates down into place (see Fig. 2).
Fig. 1  Cotter pin attaches the caster 
to the case
COTTER PIN
CONNECTOR
TAB
SLOT
FRONT
KICK PLATE
SCREW
Fig. 2  Attaching the front and end kick plates
5