Gossen Metrawatt 751 用户手册

下载
页码 48
GOSSEN METRAWATT GMBH
37
Test Sequence per VDE 0751 
Select connection, select test regulation VDE 0751, classify the DUT (SC I or II), application part? (type B/BF/CF)
Visual inspection
OK?
SC I: R
PE
OK?
R
ISO
OK?
Short-circuit
at DUT?
Yes/No
No
Display results, save/print report
Yes
No
Test
OK?
Framed with dashed line: 
The test is only run
 
– 
If it has been activated in the initial 
program window, or in the Setup 
menu under Sequence ...
or
– If at all possible
Switch line voltage to test socket, start function test
Start
function test
I
EDL
ΔI
Contact all exposed, conductive parts with the probe. 
The test can be repeated as often as desired for various protective 
conductor parts with the manual sequence*.
* If it is not clear whether or not all 
exposed, conductive parts are 
connected to one another or to the 
protective conductor, testing can be 
performed in the manual mode.
Contact all exposed, conductive parts with the probe.
Yes
Switch DUT on
I
DL
No
ΔI or I
DL
: only if the device is switched electronically
OK?
No
No
No
Yes
Yes
I
EPL
I
PL
OK?
No
No
Yes
Application parts B, BF, CF