Ez Access Mobility Aid 12101 用户手册
Page | 4
The EZ-ACCESS
®
Pathway
®
Modular 45-Degree Angle Platform (MPARR45) is designed to turn a 45° corner
between two Pathway modular ramps. Handrails, four each support tubes and four each modular feet (two pair
MSTSxxPR where xx denotes the support tube usable length), and two Ramp Hanger Pairs (MRHP) are
required to make the connection.
MSTSxxPR where xx denotes the support tube usable length), and two Ramp Hanger Pairs (MRHP) are
required to make the connection.
1.
INSTALLING SUPPORT TUBES AND FEET
1.1.
Support tubes will come in the length you ordered and will not need to be cut. It is recommended
that the plug be installed in the support tube before installing the tube into the platform.
that the plug be installed in the support tube before installing the tube into the platform.
1.2.
Stand platform on its side and insert support tubes into each of the four corner pockets. Adjust the
support tubes to the approximate height needed and tighten one of the set screws in each of the
four corner pockets with a 3/16” Allen wrench, just enough to hold the support tube in place. NOTE:
do not over tighten. The second set screw will be tightened after final height adjustments are
complete (FIG. 1).
support tubes to the approximate height needed and tighten one of the set screws in each of the
four corner pockets with a 3/16” Allen wrench, just enough to hold the support tube in place. NOTE:
do not over tighten. The second set screw will be tightened after final height adjustments are
complete (FIG. 1).
WARNING: Do not attempt to walk on the platform until all support tube set screws have been
tightened securely and the feet have been properly installed.
1.3.
Place the platform with support tubes attached into the upright position.
1.4.
Position platform, then lift each corner of the platform and install a base foot on each support tube
(oriented so that the foot extends under the platform, except as noted in FIG. 1). Make sure the feet
are fully engaged on the tubes and tighten the thumb screw on each foot securely. NOTE: If
installing on soft soil it may be necessary to set the base foot on a concrete pad.
(oriented so that the foot extends under the platform, except as noted in FIG. 1). Make sure the feet
are fully engaged on the tubes and tighten the thumb screw on each foot securely. NOTE: If
installing on soft soil it may be necessary to set the base foot on a concrete pad.
1.5.
Adjust the platform to the final height by adjusting the support tubes one at a time. Loosen the set
screws in the platform corner pockets, and then adjust the platform height and level. Once the final
height has been adjusted and the platform leveled, tighten both set screws in each platform corner
pocket.
screws in the platform corner pockets, and then adjust the platform height and level. Once the final
height has been adjusted and the platform leveled, tighten both set screws in each platform corner
pocket.
1.6.
Ensure that all set screws are secure and install plugs in the top of each support tube if not already
done.
done.
FIG. 1