Emerson Liebert PSA Line-Interactive UPS 500-1500VA 用户手册

下载
页码 120
Operating System Details
94
Liebert
®
 MultiLink
®
11. Select Event Configuration for the event source in MultiLink. 
12. Put a checkmark (✔)in Enable Virtual Server Action for each Event that a shutdown should 
be performed for.
13. Use the Virtual Servers for Shutdown Delay to set the time between an event’s occurence and 
when Liebert MultiLink begins shutting down the virtual servers.
14. Make sure the operating system shutdown delay for the shutdown event is set with enough of a 
delay to allow the shutdown of the guest operating systems of the virtual servers.
15. Save settings, click on the MultiLink menu at the top of the window, then click on Save Event 
Configuration.
Finish any additional configurations in Liebert MultiLink.
Schedule a time to place the UPS on battery and test the entire Liebert MultiLink system to verify 
the shutdown of the VMware servers.
Put a checkmark 
(
) in the Enable 
Virtual Server 
Action box for 
events that should 
cause a shutdown
Select the time for 
Liebert MultiLink 
to delay between 
an event’s 
occurrence and 
starting the 
shutdown of the 
virtual servers