Avaya Media Gateway G700 用户手册

下载
页码 768
Post-upgrade tasks
Issue 9.1 June 2006
663
 
Complete the upgrade process 
(S8300 is the primary controller)
In an SSH session to the S8300 (primary controller), access the SAT command line interface to 
complete the following procedures.
To check media modules 
1. Type list configuration all and press Enter
2. Verify that the software is communicating with all media modules and that all media 
modules are listed in the reports. 
3. Make test telephone calls to verify that Communication Manager is working. 
To enable scheduled maintenance 
1. Type change system-parameters maintenance and press Enter
2. Ensure that the Start Time and Stop Time fields' administration is the same as before the 
upgrade. 
To busy out trunks 
1. Busy out trunks that were busied out before the upgrade (see 
To check for translation corruption 
1. Type newterm and press Enter
If you do not get a login prompt and see the following message: 
Warning: Translation corruption detected
 
follow the normal escalation procedure for translation corruption before continuing the 
upgrade. 
To resolve alarms 
1. On the Maintenance Web Interface, under Alarms click Current Alarms to examine the 
alarm log. 
2. If any alarms are listed, click Clear All.
3. Resolve new alarms since the upgrade through Communication Manager using the 
appropriate maintenance reference.