AMANO HandPunch 1000 安装指导

下载
页码 56
HandPunch 1000 Installation and Operation Manual
Revision 1.2
Page 15
3.0
Mechanical Installation
Select an installation location based on the guidelines provided in the Planning an 
Installation section beginning on page 11.
3.1
Wall Plate Installation
3.1.1
Wall Preparation
For the following procedure protect the HandPunch from the dust and debris 
generated during the wall plate installation process.
1. Remove the wall plate from the packing carton. Refer to Figure 3-1 for all wall 
plate references in the following section.
Figure 3-1: Wall Plate
2. Measure and mark a point 48 1/2 inches (123 cm) from the surface of the finished 
floor. This point will correspond to the Leveling Hole where the top-center point of 
the HandPunch should be mounted.
3. For a hollow wall, drive a small nail into the wall at the mark and hang the wall 
plate from the Leveling Hole located near the top of the wall plate.
4. For a solid wall, hold the wall plate against the wall, centering the Leveling Hole 
over the mark in the wall.
NOTE
2 UPPER SCREWS
3 LOWER SCREWS
LEVELING HOLE
SURFACE
CONDUIT
ENTRY