Bühler 2895E 用户手册

下载
页码 46
bühler
Allied Front-End Loader 
- 18 - 
P4493   
INSTALLING / REMOVING LOADER 
Installing:
CAUTION
 
Prior to initial mounting, cycle loader cylinders to 
displace air.  This ensures the loader will remain in the storage position and 
operate consistently. 
1.  Position the tractor centrally and parallel 
to the loader uprights.  Drive forward slowly 
until the loader hydraulic hoses can be 
coupled.  Shut tractor off and set park brake.  
Couple the loader hoses to the matched color 
code identifiers on the auxiliary valve for 
proper orientation of loader operation. 
2.  Extend lift cylinders to tilt both loader 
uprights approximately 30 degrees.  Rollback 
bucket to further raise upright for additional 
clearance.  Both upright base pivots must be 
above the loader mount cradle. 
CAUTION
 
Verify front and side clearances during installation to 
avoid tractor damage.  Position hydraulic hoses such that they will not be 
pinched or stretched during installation. 
3.  Slowly drive the tractor forward until the 
upright base pivot contacts the mount plate. 
4.  Slowly extend the bucket and retract the 
lift cylinders to lower the upright pivot into the 
mount plate cradle.  Ensure both uprights are 
fully engaged within the mount plate cradle.