Weil-McLain 88 用户手册

下载
页码 40
Boiler manual:     • Installation    • Start-Up    • Maintenance    • Parts
3
Part No. 550-100-068/0308
Before installing boiler                                                                 
4
Set boiler in place                                                                         
7
Assembling the block                                                                  
8
Perform hydrostatic pressure test                                             
11
Complete block assembly                                                          
12
Connect water boiler piping                                                       
14
Connect steam boiler piping                                                      
16
Install jacket                                                                                 
20
Pipe tankless heaters                                                                 
25
Install water boiler controls                                                       
26
Install steam boiler controls                                                       
27
Connect breeching and venting systems                                 
29
Install burner & wiring and fill system                                      
31
Install fuel piping                                                                         
32
Make final adjustments                                                              
33
Handling ceramic fiber and fiberglass materials                      
34
Ratings                                                                                         
35
Dimensions                                                                                  
36
Parts                                                                                              
38
Warranty                                                                                       
40
Contents