Utica Boilers SW Series II 安装指导

下载
页码 20
6
1. 
Typical installation using circulators shown in Figure 
1.
2. 
Typical installation using zone valves shown in Figure 
2.
3. 
Hot water boilers installed above radiation level must 
be provided with low water device either as part of 
boiler or at time of boiler installation. 
4. 
When boiler is connected to heating system utilizing 
multiple zoned circulators, each circulator must be 
supplied with fl ow control valve to prevent gravity 
circulation.
• Reduced pressure back fl ow preventer must be 
present under provisions required by Environmental 
Protection Agency (EPA).
5. 
Bypass piping is an option which gives ability to adjust 
supply boiler water temperature to fi t system or 
condition of installation. This method of piping is not 
typically required for baseboard heating systems.
CONNECTING SUPPLY AND RETURN PIPING
• Method used to protect systems using radiant 
panels and material they are encased in from high 
temperature supply water from boiler. See Figure 
3.
• Method used to protect boilers from condensate 
forming due to low temperature return water. 
Generally noticed in large converted gravity systems 
or other large water volume systems. See Figure 4.
• Method used to protect boilers from condensate 
forming as well as protecting heating system from 
high water temperature. See Figure 5.
6. 
When using bypass piping, adjust valves A and B until 
desired system temperature is obtained.
7. 
Bypass loop piping must be same size piping for supply 
and return.
8. 
Connect supply and return piping as suggested in 
Figure 6, when boiler is used in connection with 
refrigerated systems:
Figure 3 
Check local codes for maximum 
from fl oor or allowable safe point of 
discharge