Monogram ZSC120XJSS 安装指导

下载
页码 20
8
Installation Preparation
Preparation 
WITHOUT
 an Accessory Storage Drawer
PREPARE THE OPENING (cont.)
Installation under a GE/Monogram 
Microwave Oven and over a Warming 
Drawer:
NOTE: Additional clearances between the cutouts 
may be required. Check to be sure the oven 
supports above the Warming Drawer location  
do not obstruct the required interior depth  
and height. See Warming Drawer installation 
instructions for details.
CAUTION:
 For personal safety, the 
mounting surface must be capable of supporting 
the cabinet load, in addition to the added 
weight of this approximate 80-pound oven, plus 
additional oven loads of up to 50 pounds or a 
total weight of 130 pounds.
PRECAUCIÓN:
 Para seguridad 
personal, la superficie de montaje debe poder 
soportar la carga del gabinete, además del peso 
aproximado de 80 libras del horno, más las 
cargas adicionales del horno de hasta 50 libras  
o un peso total de hasta 130 libras.
Construct Solid 
Bottom Min. 
3/8s Plywood 
Supported by  
2 x 4 or 2 x 2 
Runners all  
Four Sides
30s
23-1/2s
25-1/4s
17-1/2s
2s Min. 
(3s Recommended)
Per Oven 
Requirement
3.5s Min.  
(4.5s Recommended)
PREPARE THE OPENING (cont.)
Installation over another GE/Monogram  
Under-the-Counter (UTC) oven:
‡,I\RXDUHPRXQWLQJDQ8QGHUWKH&RXQWHU
GE/Monogram oven over another, use the 
dimensions shown. The middle rail separating  
the two openings may need to be larger than  
the 2s minimum shown.
30s
23-1/2s
25-1/4s
17-1/2s
2s Min.  
(3s Recommended)
Construct Solid 
Bottom Min. 
3/8s Plywood 
Supported by  
2 x 4 or 2 x 2 
Runners all  
Four Sides
17-1/2s
Per Warming  
Drawer 
Requirement