GE GEH50DFEJSR 规格说明表单

下载
页码 4
For answers to your Monogram,
® 
GE Profile
  
or GE
®
 appliance questions, visit our website  
at geappliances.com or call GE Answer Center
®
  
service, 800.626.2000.
Normal startup—what to expect after pressing the POWER button
Elapsed time
Hybrid water heater actions
Comments
:00 to 2:00 minutes
Unit will go through self-check
This 2 minute off-time prevents compressor from being “short cycled”  
(improved reliability).
2:00 to 10:00 minutes
Compressor and fan turn on and run for 8 minutes
This 8 minute period is used to ensure tank is full of water (dry fire prevention algorithm).
10:00 to 30:00 minutes Compressor and fan turn off, heating   elements turn on for approximately 
20 minutes.
Quickly provides initial amount of hot water for user (~25 gallons).
30 minutes and beyond Upper element turns off, and compressor turns back on.
Uses efficient heat pump for majority of heating.
NOTE: Heat pump operating range is 35°F to 120°F.
Verification Checklist:
1
Tank location: 
- Is 
room size less than 10x10x7 (700 cu. ft.)? If yes, Louvered door or similar ventilation is needed. 
- Back of unit 
away from wall by 7 inches. 
Front of unit is free and clear.  
- Is the water heater
 level? If no, add shims under the base of the unit.
2
Plumbing connections: 
- Do not prevent 
air filter removal. 
- No leaks after 
filling the tank with water, either when water is flowing or not.
3
Condensate lines are in place:  
- Longer PVC pipe on lower drain nozzle and directed into a floor drain or a condensate pump.
4
T & P valve is working and drain line completed per local code.
5
Electrical connection does not prevent air filter removal.
Verify 
control panel displays 120°F (49°C) Hybrid Mode.
Verify 
filter is in place.
GEH50DFEJSR 
GeoSpring
 hybrid electric water heater
Specification Created 10/14