Dacor RNRP36GSLPH 安装指导

下载
页码 16
13
Installation Instructions
Verifying Proper Operation
Before operating the range, read the accompanying use and 
care manual completely. It contains Important safety, service and 
warranty information.
1.  Before beginning the test procedure, ensure that all cooktop 
control valves are in the 
OFF position, and all burner rings, 
burner caps, and grates are properly positioned on the 
cooktop frame. 
2.  Turn on the gas supply at the shut-off valve.
3.  Connect the power cord to the electrical outlet. When the 
range is first connected, the oven indicator light flashes on 
and off for about 10 seconds while the range’s circuitry starts 
up. Wait for the light to stop flashing before going to step 4.
4.  Test one of the burners by pushing the knob in and turning 
it counterclockwise to the 
HIGH position. It may take up to 
four seconds for ignition to occur, at which time the ignitor will 
stop sparking. If ignition does not occur within four seconds, 
turn off the knob, wait for at least five minutes to allow any 
gas to dissipate, then repeat the ignition test. After ignition, 
rotate the control knob counterclockwise from 
HIGH to LOW 
to adjust the flame height progressively. When the range is 
installed properly, the flame will 
be steady and quiet. It will also 
have a sharp, blue inner cone that 
will vary in length proportional to 
the burner size. Dacor’s Smart 
Flame™ feature reduces the flame 
under the grate fingers to increase 
grate life. If the range is equipped 
for use with LP gas, the ends of 
the flame may be yellow at the 
tips, which is normal.
5.  Turn the control knob to the 
OFF position. 
6.  Repeat the ignition test for all remaining burners. 
After testing all the cooktop burners, turn them off.
7.  Open the oven door(s). Test the oven light(s) by 
turning on the light switch(s) on the control panel.
8.  Turn on the convection fan switch(s). You should hear the 
convection fan, located behind the screen at the back of the 
oven, come on.
9.  With the oven door open, turn the oven control knob to the 
400 degree position. Both the knob itself and the oven ON 
indicator light next to the knob should illuminate. Within 60 
seconds you should hear the bake burner ignite below the 
oven floor. It should begin to give off heat.
10.  Turn the oven control knob to the BROIL position. The bake 
burner should turn off. Both the oven control knob and the 
oven ON indicator light should be illuminated.
11.  Within 60 seconds the IR burner on the ceiling of the oven 
should ignite and begin to give off heat.
12.  Turn the oven knob to the “OFF” position. On model 
RNRP48G, test both ovens.
If the range does not operate properly, follow these 
troubleshooting steps:
1.  Verify that power and gas are supplied to the range.
2.  Check the electrical connections and gas supply to ensure 
that the installation has been completed correctly.
3.  Repeat the burner ignition test and/or oven test.
4.  If the appliance still does not work, contact Dacor Distinctive 
Service at (800) 793-0093 ex. 2822. Do not attempt to repair 
the appliance yourself. Have the model and serial numbers 
available when you call. See inside cover for location.
Dacor is not responsible for the cost of correcting problems 
caused by a faulty installation.
Removing the Range for Service
1.  Turn the gas supply valve to the off position.
2.  Disconnect the power cord from the electrical outlet.
3.  Pull the range out from the wall
Reinstalling the Range After 
Service
1.  Push the range into operating position, making sure the anti-
tip bracket is engaged (see page 10).
2.  Connect the power cord to the electrical outlet.
3.  Turn the gas supply valve to the on position.
Installation Checklist
 
WARNING
• 
To ensure a safe and proper installation, the following 
checklist should be completed by the installer to ensure 
that no part of the installation has been overlooked.
• 
Proper installation is the responsibility of the homeowner. 
The importance of proper installation of your Dacor range 
cannot be overemphasized.
 
Has the plastic coating been peeled off the outside of the 
range? Have all packaging materials been removed from 
inside the oven?
 
Are all leveling legs extended down to make contact with the 
floor? Is the unit level? See page 10.
 
Is the range secured in place with the provided anti-tip 
bracket and foot according to these instructions? See pages 
6 and 10.
 
Has the gas supply inlet pressure been measured to ensure 
that it does not exceed the maximums stated in these 
instructions. See page 3.
 
Is the range connected to the gas supply according to these 
instructions and in accordance with all applicable codes? Did 
the installer check the gas supply for leaks?
 
Is the oven door properly installed according to these 
instructions? See page 10.
 
Have the burner knobs been installed in the proper locations? 
See page 11.
 
Are the burners assembled and grates properly installed 
according to these instructions? See page 12.
 
Has proper operation been verified? Has the warranty 
been activated on-line or the warranty card been filled out 
completely and mailed?
OFF Icon
Normal Flame