Broan 331H 安装指南

下载
页码 4
1. Choose a position on the outside wall. Make sure
that no wall studs, pipes or wires run through the
opening area.
2. Drill a guide hole at the center of the opening area.
3. Mark a 25" by 29-1/2" rectangle on wall located
from guide hole as shown in Figure 3.
4. Cut a rectangular hole in the siding only. Do not cut
the sheathing. Nail down all siding ends.
5. Mark an 11" diameter circle centered on the guide
hole and mark the center of the 1-1/4" diameter
electrical wiring hole.
6. Cut the 11" diameter hole in the sheathing and drill
the 1-1/4" hole as marked.
PREPARE THE BLOWER
1. Unpack the blower assembly.
2. Remove the cover and screws.
3. Remove and discard cardboard from blower wheel.
4. Remove the wiring box cover and screws.
5. Attach an appropriate U.L. approved cable con-
nector in the hole at the rear of the wiring box.
PREPARE THE INSTALLATION
LOCATION
25"
10-3/4"
29-1/2"
12-7/8"
9-1/8"
7-1/4"
1-1/4" Dia. Hole
Figure 3
ROOF INSTALLATIONS
1-1/4" Dia. Hole
7-1/4"
9-1/8"
20-1/2"
10-3/8"
11" Dia.
Hole
8-1/2"
20-3/4"
Figure 1
25"
2"
7"
29-1/2"
2"
PREPARE THE INSTALLATION
LOCATION
WALL INSTALLATIONS
ALL INSTALLATIONS
Guide
Hole
Figure 2
11" Dia.
Hole
Guide
Hole
1. Locate the blower on the rear slope of the roof.
Place it in a location to minimize duct run. The
location should be free of obstacles (T.V. leads,
electrical lines, etc.). Bear in mind, if the blower top
is level with the roof peak, it will not be seen from
the street. Keep this approximate location in mind
as you work from within the attic.
2. Mark a point halfway between rafters.
3. Drill a guide hole through the roof at this point.
4. From the outside, use the guide hole as a starting
point and mark the rectangular cutout and remove
only the shingles in this area. See Figure 1.
5. Mark an 11" diameter circle centered on the guide
hole and mark the center of the 1-1/4" diameter
electrical wiring hole. See Figure 1.
6. Cut out the roof board(s) along the 11" diameter
circle and drill a 1-1/4" hole as marked.
7. For flat roof installations, build a curb that will
mount the blower at a minimum pitch of 2/12. See
Figure 2. Discharge end of the blower should be
pointed away from prevailing winds.