Smeg SBQ48X-1 用户手册

下载
页码 12
EN 
6
6
INSTALLATION 
Wall drilling and bracket fixing for Optional Chimney Telescopic 
1200 mm
11a
406
7.2.1 11
12a
313,5
7.2.1
X
313,5
1÷ 2
833  - 1138
Wall marking: 
• Draw a vertical line on the supporting wall up to the ceiling, or as high as practical, at the
center of the area in which the hood will be installed. 
• Draw a horizontal line at 
1200mm above the hob.
• Place bracket 7.2.1 on the wall as shown about 1-2 mm from the ceiling or upper limit (see
the picture).
• Mark the wall at the centers of the holes in the bracket.
• Place bracket 7.2.1 on the wall as shown at X” below the first bracket (X = height of the up-
per chimney section supplied).
• Mark the wall at the centers of the holes in the bracket.
• Drill ø 8mm holes at all the center points marked.
• Insert the wall plugs 11 in the holes.
• Mark a reference point as indicated at (833 mm for 36” model or 1138 mm for 48” model)
from the vertical reference line and 406 mm above the horizontal reference line.
• Repeat this operation on the other side.
• Drill ø 12 mm holes at all the center points marked.
• Insert the wall plugs 11a in the holes and screw into place.
• Fix the brackets using the 12a screws supplied.