Raypak 899B 用户手册

下载
页码 5
 
Project Name / Date 
 
Division 23 52 33.13 - 1 
 
 
 
DIVISION 23 52 33.13 
 
FINNED WATER-TUBE WATER HEATERS 
PART 1 - GENERAL 
1.1 
SUMMARY 
A.  Section includes gas-fired, copper finned-tube water heaters for use with a storage tank. 
B.  Related Sections 
Specifier Note:  Use as needed 
1.  Building Services Piping – Division 23 21 00 
2.  Breeching, Chimneys, and Stacks (Venting) – Division 23 51 00 
3.  HVAC Instrumentation and Controls – Division 23 09 00 
4.  Electrical – Division 23 09 33 
1.2 
REFERENCES 
A.  ANSI Z21.10.3/CSA 4.3 
B.  ASME, Section IV 
C.  2006 UMC, Section 1107.6 
D.  ANSI/ASHRAE 15-1994, Section 8.13.6 
E.  National Fuel Gas Code, ANSI Z223.1/NFPA 54 
F.  NEC 
G.  ASME CSD-1, 2006 
1.3 
SUBMITTALS 
A.  Product data sheet (including dimensions, rated capacities, shipping weights, accessories) 
B.  Wiring diagram 
C.  Warranty information 
D.  Installation and operating instructions 
1.4 
QUALITY ASSURANCE 
A.  Regulatory Requirements 
1.  ANSI Z21.10.3/CSA 4.3 
2.  Local and national air quality regulations for low NOx (0-30 PPM NOx emissions) water 
heaters  
B.  Certifications 
1.  CSA 
2.  ASME HLW Stamp and National Board Listed 
3.  ISO 9001 
1.5 
WARRANTY 
A.  Limited five-year warranty from date of installation  
B.  Limited twenty-year thermal shock warranty from date of installation 
C.  Limited ten-year warranty for cupro-nickel heat exchangers only 
PART 2 - PRODUCTS 
2.1 
MANUFACTURER 
A.  Raypak, Inc. 
1.  Contact: 2151 Eastman Ave., Oxnard, CA 93030; Telephone: (805) 278-5300;  
Fax: (800) 872-9725; Web site: www.raypak.com 
 
 
Catalog No.:  3500.97A 
Effective: 
11-15-08 
Replaces: 
9-15-02 
DELTA LIMITED
®
, TYPE WH - MODELS 399B-899B 
SUGGESTED SPECIFICATIONS