SterlingTek A0551797 用户手册

下载
页码 86
                         SSC Series Central Chilling Stations 
Page 81 of 86 
Index 
 
Alarms 
Advanced Controls, 68 
Standard Controls, 53 
Available options, 9 
 
Checking Motor Direction, 25 
Chiller Pumps 
Advanced Controls, 64 
Chiller Shutdown, 38 
Circuit Alarm Sequence, 27 
Compressor Lead-Lag, 27 
Compressor Staging Sequence, 
27, 31 
Condenser Maintenance, 73 
Copyright information, 2 
 
Determining Flow Rate, 38 
Disclaimer information, 2 
 
Electrical connections, 19 
Electrical wiring schematics, 20 
Evaporator Maintenance, 74 
 
Freezestat Control, 28 
 
Galvanic Corrosion 
Considerations, 23 
General information 
Available options, 9 
Models covered, 8 
Necessary documents, 7 
Standard features, 8 
Graphic Panel Devices, 41 
Indicator Lights and Control 
Switches, 41 
 
Incomplete shipment, 16 
Incorrect shipment, 16 
Installation information, 19–25 
Checking Motor Direction, 25 
Connection Sizing 
Considerations, 23 
Electrical connections, 19 
Galvanic Corrosion 
Considerations, 23 
Location considerations, 19 
Piping Considerations, 21 
Process Water Connections, 
21 
Remote Air-Cooled 
Condensers, 24 
Tank Piping Connections, 22 
Water Treatment 
Considerations, 23 
Water-Cooled Condenser 
Connections, 23 
 
Location considerations, 19 
 
Makeup Valve Maintenance, 74 
Models covered, 8 
Motors 
Checking Direction, 25 
 
Necessary documents, 7 
 
Operating Compressors 
Advanced Controls, 60 
Standard Controls, 46 
Options, 9 
 
Piping Considerations, 21 
Process Water Connections, 21 
Pump Lead-Lag, 27 
Pump Seal Maintenance, 74 
Pump Tank Piping Connections, 
22 
 
SSCR Condenser 
Specifications, 14 
SSCR drawing, 13 
SSCR specifications, 13 
SSCW drawing, 11 
SSCW specifications, 12 
Remote Air-Cooled Condenser 
Installation, 24 
Remote Air-Cooled Startup, 37 
Remote Air-Cooled Startup 
Checklist, 35 
Returns, 16 
Revision number, 2 
Routine Maintenance, 73–75 
Condensers, 73 
Evaporators, 74 
Lubrication, 73 
Makeup Valve, 74 
Pump Seals, 74 
 
Safety considerations, 3 
Sequence of Operation, 25–31 
Alarms, 27 
Chilled Water Circuit, 28 
Chilled Water Manifold, 31 
Compressor Staging, 27 
Condenser Water Manifold, 
31 
Control Nipple, 31 
Control Probe, 31 
Flow Switch, 30 
Freezestat Control, 28 
High Pressure Cutout, 30 
Lead-lag Compressors, 27 
Lead-Lag Pumps, 27 
Low Pressure Cutout, 30 
Refrigeration Circuit, 28 
Shipping damages, 15 
Shipping information, 15–17 
Incomplete shipment, 16 
Incorrect shipment, 16 
Returns, 16 
Shipping damages, 15 
Uncrating, 17 
Unpacking and inspection, 15 
Specifications 
SSCR, 13 
SSCR Condensers, 14 
SSCW, 12 
Standard Controls Touchscreen, 
44, 58 
Standard features, 8 
Startup Checklist, 33–39 
Chiller Shutdown, 38 
Determining Flow Rate, 38 
Introduction, 33 
Remote Air-Cooled, 35 
Remote Air-Cooled Startup, 
37 
Water Cooled, 33 
Water Cooled Startup, 35 
System Temperatures 
Advanced Controls, 71 
 
Troubleshooting, 73–75 
 
Uncrating, 17 
Unpacking and inspection, 15 
Using the Advanced 
Touchscreen Interface, 57–72 
Alarms, 68 
Chiller Pumps, 64 
Getting Started, 59 
Introduction, 57 
Operating Chiller 
Compressors, 60 
System Temperatures, 71 
Using the Standard Touchscreen 
Interface, 44, 43–56, 58 
Alarms, 53 
Getting Started, 45 
Introduction, 43 
Operating Chiller 
Compressors, 46 
 
Water Connection Sizing 
Consideration, 23 
Water Cooled Startup, 35