Lucent Technologies 6.1 用户手册
MERLIN LEGENDCommunications System Release 6.1
System Planning
System Planning
555-661-112
Issue 1
August 1998
Prior Releases: Features and Enhancements
Page xxxi
Release 4.1 Enhancements (June, 1997)
Forward on Busy
0
Beginning with Release 4.1, the Forward, Follow Me, and Remote Call Forward
features are enhanced to remove the requirement that a call be ringing at an
extension before it can be forwarded. With the Forward on Busy enhancement, a
call to an extension with no available SA (System Access) or ICOM (Intercom)
buttons is forwarded immediately to the programmed destination, preventing the
caller from hearing a busy signal from the intended call recipient’s extension.
features are enhanced to remove the requirement that a call be ringing at an
extension before it can be forwarded. With the Forward on Busy enhancement, a
call to an extension with no available SA (System Access) or ICOM (Intercom)
buttons is forwarded immediately to the programmed destination, preventing the
caller from hearing a busy signal from the intended call recipient’s extension.
Maintenance Testing for BRI Facilities that Are
Part of Multiline Hunt Groups (MLHGs)
Part of Multiline Hunt Groups (MLHGs)
0
Beginning with Release 4.1, the NI-1 BRI (National Integrated Services Digital
Network-1 Basic Rate Interface) Provisioning Test Tool is enhanced to include
testing for BRI facilities that are part of Multiline Hunt Groups (MLHGs).
Network-1 Basic Rate Interface) Provisioning Test Tool is enhanced to include
testing for BRI facilities that are part of Multiline Hunt Groups (MLHGs).
The NI-1 BRI Provisioning Test Tool is used by Lucent Technologies maintenance
personnel on MERLIN LEGEND Communications Systems that include an
800 NI-BRI module. Technicians use the tool during system installation and
maintenance to test the functionality of the BRI lines and to report analyzed
results.
personnel on MERLIN LEGEND Communications Systems that include an
800 NI-BRI module. Technicians use the tool during system installation and
maintenance to test the functionality of the BRI lines and to report analyzed
results.