Bunn dispenser 用户手册

下载
页码 34
3
00656.0000
00986.0000
USER NOTICES
Carefully read and follow all notices on the equipment and in this manual.  They were written for your protection.
All notices are to be kept in good condition.  Replace any unreadable or damaged labels.
INITIAL SET-UP
1.
Loosen auger motor cover screws.
2.
Remove rear plastic plug from trim strip between hopper drip trays.
3.
Install support rod into hole in trim strip.
4.
Place PAF platform assembly on top of motor covers.
5.
Tighten support rod from top of platform.
6.
Retighten motor cover screws.
7.
Plug RCA cord into ULTRA base unit.
8.
Install hopper seal and press firmly into place on the flange of the cooling drum.
9.
Align the auger shaft with the flat fin of the auger. Push the augers as far as they will go and rotate them so
the flat fin is facing up.
10.
Place level probes in notch in rim of hoppers and install hoppers.
10.
Install PAF units onto hoppers and platform.
11.
Plug PAF power cord into rear of platform.
12.
Plug PAF platform power cord into proper electrical outlet.
13.
Attach a flexible water line to the .25" flare fitting on the back panel of the Powder Auto-Fill.
NOTE: A water strainer assembly (BUNN-O-MATIC #23820.1000) should be installed in line prior to the flexible
water line.
29793.1 080102
Push back until fully latched
before removing or manually
filling chilled product hopper.
34561.0000