Kobe Range Hoods CH7930SQB 用户手册

下载
页码 102
Hood Installation
CAUTION: If required to move the cooking range to install the hood, turn off the power on an 
electric range at the main electrical box.  SHUT OFF THE GAS BEFORE MOVING A GAS 
RANGE. 
1. 
Puncture the knockout holes on the hood as shown in Figure 4. 
2. 
If necessary, arrange the electrical wires to run through the 1” diameter hole on the top or 
the rear of the hood.  Refer to Figure 5. 
3. 
Using references on Table 1 and measurements on Page 22 to center the hood in place 
beneath the cabinet and flush with the front of the cabinet. 
                     
                                                                                                                  
1
" Diameter  
                                                                                                                                     Hole
 
 
 
 
 
 
     
                                  Figure 4                                                            Figure 5                                       
           
4. 
Draw electrical wires through cabinet access opening. 
5. 
Place screw (not provided) into the exact center of each knockout hole.  Make sure all 
screws are in place before tightening screws.  CAUTION: MAKE SURE THE HOOD IS 
SECURE BEFORE RELEASING. 
Ductwork Installation
6. 
Use aluminum or steel pipe to connect the plastic exhaust on the hood to the ductwork 
above.  Use duct tape to make all joints secure and air tight.