Marley Engineered Products 5200-2409-001 用户手册

下载
页码 8
GREEN
RED
WHITE
BLACK
RED
WHITE
BLACK
M
F
AMP PLUG
HI
LOW
SWITCH
HI SPEED
COMMON
LOW SPEED
EARTH
CAPACITOR
BLA
CK
BLA
CK
BLA
CK
BLA
CK
BLA
CK
GREEN
GND
BLACK
L1
(W) N
(B) L2
GREEN
RED
WHITE
BLACK
RED
WHITE
BLACK
M
F
AMP PLUG
HI
LOW
SWITCH
HI SPEED
COMMON
LOW SPEED
EARTH
PURPLE
WHITE
BLUE
GREEN
GND
BLACK
L1
(W) N
(B) L2
MOTOR
MOTOR
Installation
1. Using  template  provided,  determine  mounting
location.
2. Drill  holes  and  attach  mounting  hardware  (not
included).
IMPORTANT: THE HARDWARE AND THE 
SUPPORTING STRUCTURE MUST BE CAPABLE OF
SUPPORTING A MINIMUM 150 LB. LOAD.
NOTE:    All  installation  should  be  done  to  meet  local
building code.
3. Mount cabinet on wall and securely tighten hardware.
4. Replace  motor/blower  assembly  in  cabinet.  Secure
two  wing  nuts  on  blower  base.  Reconnect  motor
electric cord plug assembly.
5. Replace  intake  grille  with  louvers  facing  down  and
refasten knurled nuts.
ELECTRICAL CONNECTIONS
WARNING:  ALL
AIR  CURTAINS  SHOULD  BE
INSTALLED BY QUALIFIED PERSONNEL.
1. Connect motor per nameplate to correct power supply.
Use adequate size wire for all branch and feeder runs.
2. Install  all  wiring,  protection  and  grounding  in
accordance  with  the  National  Electrical  Code  (NEC)
and all local requirements.
WARNING: THIS FAN HAS AN INTERNAL SELF
RESETTING THERMAL OVERLOAD PROTECTOR.
ALWAYS DISCONNECT FROM POWER SUPPLY
BEFORE SERVICING.
3. Remove  two  screws  from  switch  box  and  remove
cover.
NOTE: Motor is prewired to high/low toggle switch. (See
wiring diagram, Figure 5.)
4. Run  wires  from  power  supply  to  switch  box  using
appropriate  wiring  according  to  local  code.  (Use  a
flexible  connector  to  allow  for  possible  angle
adjustment.)
5. Connect wires to the two lead wires provided with wire
nuts  (not  included).  Connect  black  supply  to  center
terminal  of  rocker  switch,  white  neutral  to  white  (for
220  volt  units,  L2  will  connect  to  black  or  white  with
black  tape  lead),  green  grounding  lead  to  grounded
conductor of supply circuit. No loose strands or loose
connections  should  be  present.  After  splices  are
made, wires should be spread apart so that the green
and white wires are on one side of outlet box and the
black wires are on other side. Turn splices upward and
carefully push all wiring into outlet box.
6. Replace switch box cover.
7. Unit is ready for operation.
CAUTION: Make sure amp rating of any ON/OFF
switch exceeds nameplate amp rating of motor.
8. Restore power.
NOTE: Air curtain has high/low selector switch. See
Operation section for proper setting instructions.
9. Upon  completion  of  all  installation,  inspect  unit  for
excessive  vibration  during  operation.  If  excessive
vibration  is  noticeable,  disconnect  power  supply.
Inspect 
mounting 
installation 
and 
refer 
to
Troubleshooting Chart for probable cause.
Above for 1/4, 1/2 and 3/4 HP 120 volt motors and
1/2 and 3/4 HP 220 volt motors.
Above for 1/4 HP 220 volt motor.
3