Hoshizaki SRH/3 KM-1400SWH-M 用户手册

下载
页码 101
25
2. "G" Control Board with Harvest Pump Timer Diagnosis
3) 
Power On: Turn on the power supply, then move the control switch to the "ICE" position. 
A 5-sec. delay occurs. CB red "POWER OK" LED and green "BC CLOSED" LED turn 
on. If yellow "BC OPEN" LED is on, check CB K4 jumper.
Note: • CB red "POWER OK" LED remains on unless the 10.5VAC power supply is 
interrupted (K2 connector).
• Check CB using the steps in "II.C. Control Board Check."
• Confirm CB green "BC CLOSED" LED is on. If CB yellow "BC OPEN" LED is on, 
confirm CB K4 jumper is in place. Otherwise, CB yellow "BC OPEN" LED is on 
and appliance will not start.
a)
 Power On Diagnosis: If CB red "POWER OK" LED is off, confirm 10A fuse is good. 
Check for 115VAC at control switch #1 (BR) to neutral (W) then at control switch 
#2 (P) to neutral (W). If 115VAC is present on #1 (BR) and not on #2 (P), replace 
control switch. If 115VAC is present on control switch #2 (P), check for 115VAC at 
HPS (P) to neutral (W) then HPS (BK) to neutral (W). If 115VAC is present at HPS 
(P) and not at HPS (BK), HPS is open. See HPS Diagnosis below. If 115VAC is 
present at HPS (BK), check for 10.5VAC at CB K2 #1 red wire to CB K2 #2 red wire. 
If 10.5VAC is not present, check that the cleaning valve interlock switch is closed. 
Next, check CT continuity. If open, replace CT.  
b)
 HPS Diagnosis: Confirm FM is energized and fan blade turns freely. Confirm 
condenser coil is not dirty. Confirm that the location meets installation requirements. 
See the appliance's instruction manual for details. Confirm there are no restrictions in 
the refrigeration circuit.  
Harvest Cycle: HGV, strainer, or check valve.  
Freeze Cycle: FM, FMR, TXV, HM, LLV, WRV, strainer, check valve, drier, damaged 
line set or fitting, and fan blade for binding. 
Let refrigeration circuit pressures equalize. If HPS does not reset and pressures 
are equalized, replace HPS. If pressures are not equalized, reclaim refrigerant and 
diagnose refrigeration circuit restriction. 
 4) 
1-Min. Fill Cycle – LED 4 is on. WV and X11 relay energize. After 1 min., CB checks 
for a closed FS. If FS is closed, the harvest cycle begins. If harvest cycle begins (Comp, 
HGV, FMR energized), continue to step 5a. If FS is open, WV remains energized 
through additional 1-min. fill cycles until water enters the water tank and FS closes 
(low water safety protection during initial start up and at the end of each harvest). 
Diagnosis: Check that water enters the water tank. If not, check that the water supply 
line shut-off valve is open and screens or external filters are clear. Check for 115VAC 
at CB K1 #6 (O) to neutral (W). If 115VAC is not present, replace CB. If 115VAC is 
present, and WV does not energize, check for 115VAC at WV. If 115VAC is present, 
check coil continuity. If open, replace WV. If the water tank fills, but the appliance fails to 
start harvest (Comp energized), check for open FS. See "II.E. Float Switch Check and 
Cleaning." If FS is closed and CB fails to start the harvest cycle after 1 min., replace 
CB.