Bunn CEZ-TSR 用户手册

下载
页码 32
Page 23
BUNN
MANUFACTURED BY BUNN-O-MATIC CORPORATION
                   SPRINGFIELD, ILLINOIS, U.S.A.
MODEL
S/N
VOLTS  A.C.                    AMP                  WATTS
PHASE                             WIRE                 HERTZ              
COVERED UNDER ONE OR MOREOF THE FOLLOWING PATENTS :
ONE OR MORE OTHER PATENTS MAY BE PENDING 
SERVICE (cont.)
SWITCH PANEL - Model CDBC-APS/TS/TSR
Location:
  The  Switch  Panel  is  located  in  the  front  of  the
hood.
Test Procedures:
The test procedures for the switch panel and the
control board will vary depending upon the problems
experienced by the brewer. Refer to the Troubleshoot-
ing guide beginning on page 9. The troubleshooting
guide  is  divided  into  three  sections,  Refill  Circuit,
Heating Circuit, and Brewing Circuit.
P1916
FIG. 4 SWITCH PANEL
Removal and Replacement:
1. Disconnect  the  11-pin  connector  to  the  switch
panel from the control board.
2. Remove the four #6 screws, nylon washers and
the two #4-40 screws securing the control board
to the end cap assembly and set aside.
3. Gently  pry  the  switch  panel  from  the  end  cap
assembly.
4
Remove any adhesive that remains on the end cap.
5. Remove the adhesive backing from the new switch
panel. Insert the ribbon connector through the slot
in the end cap and apply the switch panel to the end
cap.
6. Install the control board to the back side of the end
cap using the four #6 screws, nylon washers and
the two #4-40 screws to the end cap assembly.
NOTE: The four nylon washers must be installed
under the heads of the four #6 screws to prevent
a possible shorting of the control board circuits.
7. Reconnect the 11-pin connector from the switch
panel to the control board making sure every pin
on the control board is inserted into the ribbon
cable plug.
29253 071599