NCR 7455 用户手册

下载
页码 52
24
Site Preparation
Cable Routing Considerations
External cables can be routed out the back of the Table-Top Mount.
The internal cable connectors on the terminal are located on the
underside of the Core Module under the Cable Cover.
18365
Screws (2)