 Server System SR1680MV Service Guide
Figure 65. Location Of Spring Screw Holes
Table 43. Location and Adapt Depth for Racks
Procedure to install the rail kit
Note: Please follow the steps below before you install the rail:
1. To avoid a potential electrical shock hazard, a third wire safety grounding 
conductor is necessary for the rack installation.
2. The equipment rack must provide sufficient airflow to the system to maintain 
proper cooling.
Procedure:
1. Put the tighten screws2 into the washers.
2. Install the tighten screws2 with washers into the hole of the rails (Recommended 
Driver Force: 5 lb-in).
Sprong Secure Hole
Adapt Depth For Racks
HOLE 1
782.0~794.5 mm
HOLE 2
769.5~782.0 mm
HOLE 3
757.0~769.5 mm
HOLE 4
744.5~757.0 mm
HOLE 5
732.0~744.5 mm
HOLE 6
719.5~732.0 mm
HOLE 7
707.0~719.5 mm