Lenovo 6445 用户手册

下载
页码 112
1
 
RAID
 
controller
 
4
 
Battery
 
mounting
 
tabs
 
2
 
Battery
 
cable
 
5
 
Battery
 
mounting
 
clips
 
3
 
Battery
 
6
 
Battery
 
cable
 
connector
  
 
9.
   
Turn
 
the
 
new
 
ServeRAID-8k
 
SAS
 
controller
 
so
 
that
 
the
 
keys
 
on
 
the
 
bottom
 
edge
 
align
 
correctly
 
with
 
the
 
connector.
 
10.
   
Firmly
 
press
 
the
 
ServeRAID-8k
 
SAS
 
controller
 
straight
 
down
 
into
 
the
 
connector
 
by
 
applying
 
pressure
 
on
 
both
 
ends
 
of
 
the
 
controller
 
simultaneously.
 
The
 
retaining
 
clips
 
snap
 
into
 
the
 
locked
 
position
 
when
 
the
 
controller
 
is
 
firmly
 
seated
 
in
 
the
 
connector.
 
Note:
 
If
 
there
 
is
 
a
 
gap
 
between
 
the
 
controller
 
and
 
the
 
retaining
 
clips,
 
the
 
controller
 
has
 
not
 
been
 
correctly
 
installed.
 
In
 
this
 
case,
 
open
 
the
 
retaining
 
clips
 
and
 
remove
 
the
 
controller;
 
then,
 
reinsert
 
the
 
controller.
 
11.
   
Remove
 
the
 
battery
 
from
 
the
 
ServeRAID-8k
 
SAS
 
Controller
 
package.
 
12.
   
Slide
 
the
 
battery
 
mounting
 
tabs
 
into
 
the
 
battery
 
mounting
 
clips
 
on
 
the
 
server
 
wall
 
that
 
is
 
next
 
to
 
the
 
ServeRAID
 
SAS
 
controller
 
connector.
 
13.
   
Connect
 
the
 
battery
 
to
 
the
 
ServeRAID-8k
 
SAS
 
Controller.
 
14.
   
Replace
 
the
 
air
 
baffle
 
over
 
the
 
DIMMs.
 
See
 
the
 
User
 
Guide
 
for
 
more
 
information.
 
15.
   
Replace
 
the
 
riser-card
 
assembly.
If
 
you
 
have
 
other
 
optional
 
devices
 
to
 
install
 
or
 
remove,
 
do
 
so
 
now.
 
Otherwise,
 
go
 
to
 
Notes:
  
1.
   
When
 
you
 
restart
 
the
 
server
 
for
 
the
 
first
 
time
 
after
 
you
 
install
 
a
 
ServeRAID-8k
 
SAS
 
controller,
 
the
 
monitor
 
screen
 
remains
 
blank
 
while
 
the
 
controller
 
initializes
 
the
 
battery.
 
This
 
might
 
take
 
a
 
few
 
minutes,
 
after
 
which
 
the
 
startup
 
process
 
continues.
 
This
 
is
 
a
 
one-time
 
occurrence.
 
Important:
 
You
 
must
 
allow
 
the
 
initialization
 
process
 
to
 
be
 
completed.
 
If
 
you
 
do
 
not,
 
the
 
battery
 
pack
 
will
 
not
 
work,
 
and
 
the
 
server
 
might
 
not
 
start.
 
The
 
battery
 
comes
 
partially
 
charged,
 
at
 
30%
 
or
 
less
 
of
 
capacity.
 
Run
 
the
 
server
 
for
 
4
 
to
 
6
 
hours
 
to
 
fully
 
charge
 
the
 
controller
 
battery.
 
The
 
LED
 
just
 
above
 
the
 
battery
 
on
 
the
 
controller
 
remains
 
lit
 
until
 
the
 
battery
 
is
 
fully
 
charged.
 
Until
 
the
 
battery
 
is
 
fully
 
charged,
 
the
 
controller
 
firmware
 
sets
 
the
 
controller
 
cache
 
to
 
write-through
 
mode;
 
after
 
the
 
battery
 
is
 
fully
 
charged,
 
the
 
controller
 
firmware
 
re-enables
 
write-back
 
mode.
 
2.
   
When
 
you
 
restart
 
the
 
server,
 
you
 
will
 
be
 
given
 
the
 
opportunity
 
to
 
import
 
the
 
existing
 
RAID
 
configuration
 
to
 
the
 
new
 
ServeRAID
 
SAS
 
controller.
Completing
 
the
 
installation
 
To
 
complete
 
the
 
installation,
 
complete
 
the
 
following
 
steps:
 
1.
   
Install
 
the
 
cover.
 
See
 
for
 
more
 
information.
 
2.
   
Install
 
the
 
server
 
in
 
the
 
rack
 
cabinet.
 
See
 
the
 
Rack
 
Installation
 
Instructions
 
that
 
come
 
with
 
the
 
server
 
for
 
detailed
 
information
 
about
 
how
 
to
 
install
 
the
 
server
 
in
 
a
 
rack
 
cabinet.
 
 
30
 
ThinkServer
 
RD120
 
Types
 
6444,
 
6445,
 
6446,
 
and
 
6447:
 
Installation
 
Guide