Edimax Technology ES-5224RF+ 用户手册

下载
页码 29
 
8
Operating Environment 
This smart switch must be installed and operated within the 
limits of the specified operating temperature and humidity (see 
previous section on Specifications). Do not place objects on top 
of the unit or obstruct any vents at the sides of the unit. Do not 
position the unit near any heating source such as heaters, 
radiators, or direct exposure to sun. Do not expose the unit to 
water and or moisture. If necessary, use a dehumidifier to reduce 
humidity. 
Connecting to network devices 
1.  All ports of this switch support the Auto-MDI/MDI-X 
function. That is to say, you can connect any device 
(including PC, Switch, Hub) to a port of this switch using a 
regular cable. The RJ-45 port will auto-detect and 
auto-switch to the correct MDI/MDI-X mode. (do not need 
to connect to a specific uplink port or cross-over cable) 
2. 
Connect one end of the network cable to the RJ-45 port on 
the front panel, and connect the other end of the network 
cable to the RJ-45 port on the network device. Follow the 
same procedure to connect all the RJ-45 ports of the switch. 
Maximum length, using UTP cable, between the switch and 
connected device is 100 meters (300ft). Once the network 
cable is connected to both ends and the attached network 
device is powered on, the LNK/ACT LED should be lit. 
3. 
Make sure the wiring is correct. You need to use Category 
3/4/5 cable for 10Mbps operation or Category 5 cable for 
100Mbps connections. 
Connecting the power 
Plug the power cable into the internal three-pronged power 
plug. Connect it to an electrical outlet then turn on the switch.