Toshiba ProT1!0 用户手册

下载
页码 279
Test Program for Field. 
Satellite T110 and Satellite Pro T110 Tests and Diagnostics Manual 
21
 
 
Test Process: 
 
1.   Checks the memory size to determine the maximum size of installed 
memory. 
 
2.   Tests memory addresses 0 to the maximum installed. 
 
3.   Writes, reads, and compares test data after a memory refresh cycle 
(16ms or more). 
 
NOTE: There may be a short delay between write and read operations, 
depending on the memory size. 
 
Subtest 05 
Stress Test 
This subtest writes the following 16KB data patterns to the Write/Read Buffer 
in conventional memory. 
data: 
FFFFFFFFFFFFFFFF0000000000000000 
 
5555555555555555AAAAAAAAAAAAAAAA 
 
CCCCCCCCCCCCCCCC3333333333333333 
 
0000000000000000FFFFFFFFFFFFFFFF 
 
AAAAAAAAAAAAAAAA5555555555555555 
 
3333333333333333CCCCCCCCCCCCCCCC 
 
FFFFFFFFFFFFFFFF0000000000000000 
 
0000000000000000FFFFFFFFFFFFFFFF 
 
5555555555555555AAAAAAAAAAAAAAAA 
 
AAAAAAAAAAAAAAAA5555555555555555 
 
CCCCCCCCCCCCCCCC3333333333333333 
 
3333333333333333CCCCCCCCCCCCCCCC