Jacuzzi SUMMER RAINTM 2 WALL & 3 WALL WALK-IN SHOWER SYSTEMS 用户手册

下载
页码 32
11
2 WALL:  TOWER, FIXED WALL AND CURVED GLASS INSTALLATION
STEP 13A
Insert fixed glass support rail into panel post and tighten
set screw.
GLASS PANEL
SUPPORT RAIL
DRILL 1/8" PILOT HOLE AND
SCREW M3.5X9.5 mm SCREW
INTO HOLE
STEP 13B
Drill a 1/8" pilot hole into tower support rail using the hole
in the glass panel support rail. Screw  M3.5X9.5 mm
screw into hole.
STEP 14
Install cover cap on fixed glass wall post.
STEP 15
Install glazing gasket on fixed glass wall post and curved
glass wall post on the inside.  Note orientation of gasket.
Soapy water may help to insert the glazing gasket.
COVER CAP
WALL POST
GLASS
GLAZING GASKET
INSIDE OF
ENCLOSURE
GLAZING GASKET
INSIDE OF
ENCLOSURE
TOWER TOP PLATE