Bushnell 950 用户手册

下载
页码 30
6
STEP 1 – Main Frame Assembly
a) Remove (4) Allen Bolts, (4) Washers,
(2) Nylon Nuts and (2) Nut Caps from
Main Frame, see Figure 1.
b) Position Left and Right Roller Tubes
behind Main Frame with Roller Tracks 
on top and rear Allen Bolts facing 
each other.
c) Slide Left and Right Roller Tubes into 
Main Frame, align bolt holes and 
secure with (4) Allen Bolts, (4) Washers
and (2) Nylon Nuts removed in Step 1a.
Tighten bolts with Allen Wrench provided
and install (2) Nut Caps.
d) Remove (2) Allen Bolts and (2) Washers
from rear of Left and Right Roller Tubes.
e) Position Stabilizer Bar between Right and
Left Roller Tubes, align bolt holes and 
re-install (2) Allen Bolts and (2) Washers
that were removed in Step 1d. Tighten
bolts with Allen Wrench provided.
STEP 2 – Foot Platform Installation
a) Remove (2) Allen Bolts, (2) Washers 
and (2) Nylon Nuts from the underside 
of each Foot Platform, see Figure 2.
b) Rotate Crank to the down stroke 
position and slide (1) Foot Platform 
onto either Front Foot Tube, see 
Figure 2.
c) Align bolt holes and secure using 
(2) Allen Bolts, (2) Washers and 
(2) Nylon Nuts removed in Step 2a.
d) Lower Foot Platform and position 
Roller in Roller Track, see Figure 2.
e) Repeat Steps 2b - 2d to install the 
remaining Foot Platform.
Figure 1 - Assemble Main Frame
Figure 2 - Install Foot Platforms
left front
foot tube
main
frame
M8 x 90mm
allen bolt
left roller tube
right roller
tube
M8 x 15mm
allen bolt
right front
foot tube
M8 washer
roller track
M8 x 20mm
allen bolt
stabilizer
bar
M8 washer
nut
cap
M8
nylon
nut
roller track
foot platform
foot platform
M8 x 80mm
allen bolt
left front
foot tube
main
frame
right front
foot tube
M8
nylon
nut
M8 washer
M8 x 80mm
allen bolt
M8
washer
roller
roller
crank