Lucent Technologies 555-230-024 用户手册
Basic DEFINITY ECS Documents
Issue 5 January 1998
C-3
555-230-024
Provides procedures and information for hardware installation and initial testing
of single-carrier cabinets.The Release 5 version of this document applies to
Release 6 as well.
of single-carrier cabinets.The Release 5 version of this document applies to
Release 6 as well.
This document is available in the following languages: English, German (DE),
Dutch (NL), Brazilian Portuguese (PTB), European French (FR), Castillian
Spanish (SP), Italian (IT), Russian (RU), and Japanese (JA). To order, append the
language suffix to the document number; for example, 555-230-894DE for
German. No suffix is needed for the English version.
Dutch (NL), Brazilian Portuguese (PTB), European French (FR), Castillian
Spanish (SP), Italian (IT), Russian (RU), and Japanese (JA). To order, append the
language suffix to the document number; for example, 555-230-894DE for
German. No suffix is needed for the English version.
DEFINITY ECS Release 6 — Installation and Upgrades for CSCC, Issue 1
,
555-230-124
Provides procedures and information for hardware installation, upgrades, and
initial testing of compact single-carrier cabinets. The Release 5 version of this
document applies to Release 6 as well.
initial testing of compact single-carrier cabinets. The Release 5 version of this
document applies to Release 6 as well.
DEFINITY ECS Release 6 — Installation and Test for Multi-Carrier Cabinets,
Issue 4, 555-230-112
Issue 4, 555-230-112
Provides procedures and information for hardware installation and initial testing
of multi-carrier cabinets.
of multi-carrier cabinets.
DEFINITY ECS Release 6 — Installation and Test for Compact Modular
Cabinets, Issue 2, 555-230-128
Cabinets, Issue 2, 555-230-128
Provides procedures and information for hardware installation and initial testing
of compact modular cabinets.
of compact modular cabinets.
DEFINITY ECS Release 6 — Installation for Adjuncts and Peripherals, Issue
3
3
,
555-230-125
Provides procedures and information for hardware installation and initial testing
of ECS adjunct and peripheral systems and equipment.
of ECS adjunct and peripheral systems and equipment.
DEFINITY ECS Release 6 — Upgrades and Additions for R6r, Issue 4,
555-230-121
555-230-121
Provides procedures for an installation technician to convert an existing Generic
3 Version 4 DEFINITY Communications System to DEFINITY ECS and from
DEFINITY ECS Release 5 to DEFINITY ECS Release 6.
3 Version 4 DEFINITY Communications System to DEFINITY ECS and from
DEFINITY ECS Release 5 to DEFINITY ECS Release 6.
Included are upgrade considerations, lists of required hardware, and
step-by-step upgrade procedures. Also included are procedures to add control
carriers, switch node carriers, port carriers, circuit packs, auxiliary cabinets, and
other equipment.
step-by-step upgrade procedures. Also included are procedures to add control
carriers, switch node carriers, port carriers, circuit packs, auxiliary cabinets, and
other equipment.
DEFINITY ECS Release 6 — Upgrades and Additions for R6vs/si, Issue 4,
555-230-120
Provides procedures for an installation technician to convert an existing
DEFINITY Communications System Generic 3 Version 4 to DEFINITY ECS and
from DEFINITY ECS Release 5 to DEFINITY ECS Release 6.
DEFINITY Communications System Generic 3 Version 4 to DEFINITY ECS and
from DEFINITY ECS Release 5 to DEFINITY ECS Release 6.