Deltech Fitness LS2580 用户手册

下载
页码 108
3 - 10
Operation
b) Close the Pilot Gas Supply Valve.
c)
Open the Pilot Gas Filter's Bleed Valve.  Allow pi-
lot gas system to depressurize through the Pilot
Gas Filter’s Bleed Valve.  When pilot gas pres-
sure is sufficiently reduced, the Purge Exhaust
Switching Valves will automatically open to de-
pressurize dryer through Purge Exhaust Muffler.
d)
SLOWLY open customer supplied depressuriza-
tion valve to vent the dryer internal air pressure.
e)
When all dryer pressure gauges indicate zero
pressure, close the depressurization valve.  De-
pressurization is complete.