用户手册目录Contents5Figures9Tables13Preface15Safety Symbols Used in this Document16Contacting Allied Telesis17Chapter 119Overview19Introduction20AT-SBx3112 Chassis23Ethernet Line and Control Cards Slots25Power Supply Slots25AT-SBx31GT24 Line Card27AT-SBx31GT40 Line Card28AT-SBx31GP24 PoE Line Card29AT-SBx31GS24 SFP Line Card30AT-SBx31GC40 Line Card31AT-SBx31XZ4 XFP Line Card33AT-SBx31XS6 SFP+ Line Card3410/100/1000Base-T Twisted Pair Ports35Connector Type35Speed35Duplex Mode35Maximum Distance36Cable Requirements36Automatic MDIX Detection37Straight-through or Crossover Cabling37Port Pinouts38Power over Ethernet on the AT-SBx31GP24 Line Card39Powered Device Classes39Power Budgeting40PoE Wiring40Port Numbers on the AT-SBx31GC40 Line Card42Port LEDs on the Ethernet Line Cards44AT-SBx31GT24 Line Card44AT-SBx31GT40 Line Card45AT-SBx31GP24 Line Card46AT-SBx31GS24 Line Card48AT-SBx31GC40 Line Card49AT-SBx31XZ4 Line Card51AT-SBx31XS6 Line Card51AT-SBx31CFC Central Fabric Controller Card53SYS Status LEDs54SBx STATUS LEDs55eco-friendly Button56Reset Button56NET MGMT Port58NET MGMT LED60Console (RS-232) Port60SD Card Slot60SD Status LED61USB Port61Power Supplies62LEDs63AT-SBxFAN12 Module65LED65Power Supply Interfaces (Opto-couplers)66LED66Module Names in the Management Software67Management Software Releases for the Hardware Components68Chapter 269Safety Precautions and Site Preparation69Reviewing Safety Precautions70Selecting a Site for the SwitchBlade x311274Chapter 377Installing the Chassis in an Equipment Rack77Required Tools and Material78Preparing the Equipment Rack79Unpacking the AT-SBx3112 Chassis82Adjusting the Equipment Rack Brackets84Installing the AT-SBx3112 Chassis in the Equipment Rack86Removing the Shipping Brace89Installing the Chassis Grounding Lug90Chapter 493Installing the Power Supplies93Protecting Against Electrostatic Discharge (ESD)94Installing the AT-SBxPWRSYS1 AC System Power Supply95Installing the AT-SBxPWRPOE1 AC Power Supply101Installing the AT-SBxPWRSYS1 DC Power Supply107Chapter 5113Installing the AT-SBx31CFC Card and Ethernet Line Cards113Installing the AT-SBx31CFC Central Fabric Controller Card114Installing the Ethernet Line Cards120Installing the Blank Slot Covers124Chapter 6127Installing the Transceivers and Cabling the Ports127Guidelines to Cabling the AT-SBx31GP24, AT-SBx31GT24, and AT- SBx31GT40 Line Cards128Connecting Cables to the AT- SBx31GT40 Line Card129Guidelines to Installing SFP, SFP+, CSFP, and XFP Transceivers131Installing SFP Transceivers in the AT-SBx31GS24 Line Card132Installing SFP and CSFP Transceivers in the AT-SBx31GC40 Line Card136Installing SFP+ Transceivers in the AT-SBx31XS6 Line Card140Installing AT-SP10TW Cables in the AT-SBx31XS6 Line Card144Installing XFP Transceivers in the AT-SBx31XZ4 Line Card147Cabling the NET MGMT Port on the AT-SBx31CFC Card151Chapter 7153Powering On the Chassis153Verifying the Installation154Powering On the AT-SBxPWRSYS1 AC Power Supply155Powering on the AT-SBxPWRPOE1 AC Power Supply158Powering On the AT-SBxPWRSYS1 DC System Power Supply161Choosing a Method for Attaching the Grounding Wire163Connecting the Grounding Wire with the Grounding Terminal163Connecting the Grounding Wire with Bare Wire166Choosing a Method for Attaching the Power Wires167Connecting the DC Power Wires with the Straight Terminals168Connecting the DC Power Wires with the Right Angle Terminals175Connecting Bare DC Power Wires180Monitoring the Initialization Process184Using the LEDs to Monitor the Initialization Process185Using the Console Port to Monitor the Initialization Process186Chapter 8189Verifying the Hardware Operations of the Chassis189Using the LEDs to Verify the Chassis190Using Local Management to Verify the Chassis192Starting a Local Management Session192Entering the Management Software Commands193Chapter 9197Troubleshooting197AT-SBxPWRSYS1 and AT-SBxPWRPOE1 AC Power Supplies198AT-SBxPWRSYS1 DC Power Supply199Ethernet Line Cards201Twisted Pair Ports203Power Over Ethernet205Fiber Optic Transceivers207AT-SBx31CFC Central Fabric Controller Card209AT-SBxFAN12 Fan Module210Local (Out-of-Band) Management Session211Power Supply Interfaces (Opto-couplers)212Appendix A213Technical Specifications213Physical Specifications213Environmental Specifications215Power Specifications216Safety and Electromagnetic Emissions Certifications219Port Pinouts220文件大小: 5.2 MB页数: 222Language: English打开用户手册