用户手册目录Installation Instructions– Triple-Flex High Efficiency Boile7Boiler Foundation8Clearances8Minimum Clearances to Combustible Surfaces8Receiving The Boiler8Boiler Connections9Flow Connection9Safety Relief Valves9Expansion Tank Connections9Drain Connection9Condensate Drain Connection9Gas Supply Connection9Drip Leg9Gas Piping Leak Test9Venting Of Gas Train Components10Electrical Requirements10Combustion Air Supply10Combustion Air Openings:11Louvers, Grilles, and Screens11Flue Gas Venting System12Design & Installation12Combustion Air and Venting Requirements for Canada13Marking Of Gas Vents14Before Placing Boiler In Operation14Hydrostatic Test Of Boilers And System15Test Of Gas Piping15Start-Up and Operation Triple-Flex High Efficiency Boilers16Boiler Assembly17Triple-Flex Front View17Triple-Flex Rear View18Triple-Flex Left Side View19Triple-Flex Right Side View19Triple-Flex Behind the Cabinet Door19Pilot Spark Igniter Assembly21Triple-Flex Left Flue Collector View21Triple-Flex Right Flue Collector View22SOLA Hydronic Control System22Power-up Validation22Home Page22Page Navigation23Keyboard23Status Page24Configuration Page24Configuration Password25Change Parameter Settings26Safety Verification26Fault/Alarm Handling27Operation Page28Annunciation Page29Modulation Configuration29Firing Rate Control Page29Advanced Setup30System Time30Calibrate Touch Screen30Reset / Reboot Display31Outdoor Reset31Remote Setpoint (4 – 20 mA)32Central Heat Configuration33Sound Pressure Levels33Modbus Communication35Alert Codes35Boiler Commissioning41Modulation41Test Setup41Pre Checks And Setup41Dry Run42Pilot Adjustment42Initial Light Off43Adjusting Boiler Maximum Input43Adjusting Boiler Minimum Input43Gas Meter Readings44Troubleshooting45Care and Maintenance56Cleaning The Boiler And System – New Systems57Pre-Boil Out Flushing Of System57Boil Out Procedure57Draining The System58Replacement Boiler Installations: Protection Against Corrosi58Boiler Water Treatment58External “Fire-Side” Cleaning59Suggested Maintenance Schedule59Lead Lag61General Description Of The Lead Lag Application62Lead Lag (Ll) Master General Operation62System Wiring Hookup64Lead-Lag Operation65Slave Operation And Setup66Slave Parameters66Ll Master Operation And Setup67Overall Control67Periodic Data Polling messages68Slave Status Manager68Master Active Service71Modulation Sensor71Demand and Rate72Rate Adjustment73Implementation73Rate Allocation74Burner Demand76Lead Drop-Stage On Error - LDSE:79文件大小: 4.8 MB页数: 81Language: English打开用户手册