用户手册目录SAFETY CONSIDERATIONS2DIMENSIONAL DRAWING3Clearances to Combustibles4ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS5INTRODUCTION5APPLICATIONS5General5Upflow Applications5Downflow Applications8Horizontal Left (Supply-Air Discharge) Applications9LOCATION13General13Low-Heat Only Installation13Furnace Location Relative to Cooling Equipment14Hazardous Locations14INSTALLATION14Leveling Legs (If Desired)14Installation In Upflow or Downflow Applications14Installation In Horizontal Applications14AIR DUCTS16General Requirements16Ductwork Acoustical Treatment17Supply Air Connections17Return Air Connections17Filter Arrangement17Bottom Closure Panel17Gas Piping18ELECTRICAL CONNECTIONS19115-v Wiring1924-v Wiring20Accessories20DIRECT VENTING21Common Vent Systems21Combustion-Air and Vent Piping21Kit Installation29Multiventing and Vent Terminations29Application31Condensate Drain Protection31SEQUENCE OF OPERATION31CONDENSATE DRAIN31General31(Adaptive Mode)33Two-Stage Thermostat and Two-Stage Heating34Cooling Mode34Thermidistat Mode35Super-Dehumidify Mode35Continuous Blower Mode36Heat Pump36Component Test36START-UP PROCEDURES36General36Select Setup Switch Positions36Prime Condensate Trap With Water39Purge Gas Lines39Adjustments39Set Gas Input Rate39Set Temperature Rise42Set Thermostat Heat Anticipator42CHECK SAFETY CONTROLS45Check Primary Limit Control45Check Pressure Switch45CHECKLIST46文件大小: 1.0 MB页数: 48Language: English打开用户手册