用户手册目录INTRODUCTION2CAUTION ON SAFETY3CONTENTS71. OUTLINE92. SPECIFICATIONS93. COMPOSITION94. INSTALLATION104.1 Selection of installation site104.2 Selection of gas sampling location104.3 Installation work114.4 Connection of cables114.5 Connection of pipes115. DESCRIPTION OF EACH PART136. PREPARATION FOR OPERATION136.1 Injection of clean water136.2 Supply of external power136.3 Check of sample piping, exhaust piping, etc.136.4 Airtightness test146.5 Setting of temperature inside locker146.6 Warm-up time147. INDICATION/OPERATION PANEL157.1 Name and description of each component of indication/operation panel157.2 Function and indication of indication/operation panel167.3 General operation of indication/operation panel178. CALIBRATION188.1 Kinds of standard gas188.2 Preparation of standard gas188.3 Calibration concentration setting (except zirconia O2 sensor)208.4 Calibration concentration setting (zirconia O2 sensor)228.5 Zero calibration (air point calibration in case of zirconia O2 sensor)248.6 Span calibration (low concentration point calibration in case of zirconia O2 sensor)258.7 Auto calibration269. OPERATION339.1 Operating procedure3310. MAINTENANCE3410.1 Routine maintenance and inspection3410.2 Periodic maintenance and inspection3610.3 Other maintenance and inspection3610.4 Concentration guarantee term of standard gas cylinder (for NOx , SO2 , CO and O2 analyzer)3710.5 Maintenance of sampling device3710.6 Maintenance of zirconia O2 sensor4310.7 Others, major component figures4311. STANDARD ACCESSORIES AND SPARES4411.1 Standard accessories4411.2 Spares for 1 year (optional)4512. PROCESSING OF HEATING PIPE ENDS4612.1 Outline4612.2 End processing method4712.3 Check after piping4912.4 Clamp support4912.5 Specifications of tube trace5012.6 Specifications of heating pipe5013. TROUBLESHOOTING5113.1 Troubleshooting of instrument5113.2 Error codes and remedies5214. SPECIFICATIONS53CODE SYMBOLS57SAMPLING SYSTEM BLOCK DIAGLAM58OUTLINE DIAGRAM60CONNECTION DIAGRAM61文件大小: 440.9 KB页数: 62Language: English打开用户手册