用户手册目录SHIPPING INSPECTION6ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS6TO THE INSTALLER6IMPORTANT NOTE TO THE OWNER REGARDING PRODUCT WARRANTY6PRODUCT DESCRIPTION7FEATURES7PRODUCT APPLICATION7LOCATION REQUIREMENTS & CONSIDERATIONS8CLEARANCES AND ACCESSIBILITY9EXISTING FURNACE REMOVAL9THERMOSTAT LOCATION10COMBUSTION & VENTILATION AIR REQUIREMENTS10INSTALLATION POSITIONS10HORIZONTAL APPLICATIONS & CONSIDERATIONS10FURNACE SUSPENSION11DRAIN TRAP AND LINES11LEVELING11ALTERNATE VENT/FLUE AND COMBUSTION AIR CONNECTIONS11ALTERNATE ELECTRICAL AND GAS LINE CONNECTIONS12DRAIN PAN12FREEZE PROTECTION12PROPANE GAS/HIGH ALTITUDE INSTALLATIONS12VENT/FLUE PIPE & COMBUSTION AIR PIPE12DUAL CERTIFICATION: NON-DIRECT/DIRECT VENT13MATERIALS AND JOINING METHODS13PROPER VENT/FLUE AND COMBUSTION AIR PIPING PRACTICES13TERMINATION LOCATIONS13CANADIAN VENTING REQUIREMENTS14STANDARD FURNACE CONNECTIONS14ALTERNATE FURNACE CONNECTIONS15NON-DIRECT VENT (SINGLE PIPE) PIPING17DIRECT VENT (DUAL PIPE) PIPING18VENT/INTAKE TERMINATIONS FOR INSTALLATION OF MULTIPLE DIRECT VENT FURNACES20CONCENTRIC VENT TERMINATION20SIDE WALL VENT KIT20CONDENSATE DRAIN LINES & DRAIN TRAP20STANDARD RIGHT OR LEFT SIDE DRAIN HOSE CONNECTIONS21UPRIGHT INSTALLATIONS-TRAP ON RIGHT SIDE21UPRIGHT INSTALLATIONS-TRAP ON LEFT SIDE23HORIZONTAL INSTALLATIONS24ELECTRICAL CONNECTIONS26WIRING HARNESS26115 VOLT LINE CONNECTIONS26JUNCTION BOX RELOCATION2624 VOLT THERMOSTAT WIRING27SINGLE-STAGE HEATING THERMOSTAT APPLICATION2824 VOLT DEHUMIDISTAT WIRING28FOSSIL FUEL APPLICATIONS28115 VOLT LINE CONNECTION OF ACCESSORIES (HUMIDIFIER AND ELECTRONIC AIR CLEANER)2824 VOLT HUMIDIFIER29GAS SUPPLY AND PIPING29HIGH ALTITUDE DERATE29PROPANE GAS CONVERSION29GAS PIPING CONNECTIONS30PROPANE GAS TANKS AND PIPING32CIRCULATING AIR & FILTERS33DUCT WORK - AIR FLOW33CHECKING DUCT STATIC33BOTTOM RETURN AIR OPENING [UPFLOW MODELS]34FILTERS - READ THIS SECTION BEFORE INSTALLING THE RETURN AIR DUCT WORK34UPRIGHT INSTALLATIONS35HORIZONTAL INSTALLATIONS35STARTUP PROCEDURE & ADJUSTMENT35HEATING OPERATION WITH CTK01AA THERMOSTAT (COMMUNICATING)36HEATING OPERATION WITH CTK02AA THERMOSTAT (MODULATING COMMUNICATING)37HEAT ANTICIPATOR SETTING37DRAIN TRAP PRIMING37FURNACE OPERATION37GAS SUPPLY PRESSURE MEASUREMENT37GAS MANIFOLD PRESSURE MEASUREMENT38GAS INPUT RATE MEASUREMENT (NATURAL GAS ONLY)39TEMPERATURE RISE39CIRCULATOR BLOWER SPEEDS40BLOWER HEAT OFF DELAY TIMINGS42COMFORTNET™ SYSTEM42OVERVIEW42AIRFLOW CONSIDERATION42DIP SWITCHES44FOSSIL FUEL APPLICATIONS45CTK0*AA WIRING45COMFORTNET™ SYSTEM ADVANCED FEATURES45FURNACE ADVANCED FEATURES MENU46NETWORK TROUBLESHOOTING47SYSTEM TROUBLESHOOTING47FAULT RECALL SEQUENCE47FAULT CLEAR SEQUENCE:48NORMAL SEQUENCE OF OPERATION48POWER UP48HEATING MODE48COOLING MODE49FAN ONLY MODE49OPERATIONAL CHECKS49SAFETY CIRCUIT DESCRIPTION49INTEGRATED FURNACE CONTROL (IFC)49PRIMARY LIMIT49AUXILIARY LIMIT49ROLLOUT LIMIT49PRESSURE SWITCHES50FLAME SENSOR50TROUBLESHOOTING50ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS50DIAGNOSTIC CHART50RESETTING FROM LOCKOUT50MAINTENANCE50ANNUAL INSPECTION51FILTERS51BURNERS51INDUCED DRAFT AND CIRCULATOR BLOWERS51CONDENSATE TRAP AND DRAIN SYSTEM (QUALIFIED SERVICER ONLY)51FLAME SENSOR (QUALIFIED SERVICER ONLY)51BEFORE LEAVING AN INSTALLATION52REPAIR AND REPLACEMENT PARTS52TROUBLESHOOTING CODES53STATUS CODES58WIRING DIAGRAM59文件大小: 1.3 MB页数: 60Language: English打开用户手册