Impex MD-377 Benutzerhandbuch

Seite von 14
STEP 3 (See Diagram 3)  
 
A.) Attach the Leg Developer (#7) to the Front Leg (#5).  Secure it with one M8 x 3 1/8” 
Allen Bolt (#31), two Ø 5/8” Washers (#35), and one M8 Aircraft Nut (#39). 
B.) Insert two Foam Tubes (#11) halfway through the holes on the Leg Developer. Push 
four Foam Rolls (#22) onto the Tubes from both sides. 
   
 
DIAGRAM 3