Netgear M5300-28G-POE+ (GSM7228PSv1h2) - 12-Port Managed Gigabit Switch Hardwarehandbuch

Seite von 32
Hardware Installation
11
 NETGEAR Managed Stackable Switch M5300 Series
You can also take the following steps to prevent damage from electrostatic discharge (ESD):
1. 
When unpacking a static-sensitive component from its shipping carton, leave it in the 
antistatic package until you are ready to install it. Just before unwrapping the antistatic 
package, discharge static electricity from your body.
2. 
Before moving a sensitive component, place it in an antistatic container or package.
3. 
Handle all sensitive components in a static-safe area. If possible, use antistatic floor pads, 
workbench pads, and an antistatic grounding strap.
Unpacking the Hardware
Check the contents of the boxes to make sure that all items are present before installing the 
switch.
1. 
Place the container on a clean flat surface, and cut all straps securing the container.
2. 
Unpack the hardware from the boxes. 
Carefully remove the hardware, and place it on a secure and clean surface. See 
3. 
Remove all packing material.
4. 
Note:  
If any item is missing or damaged, contact your local NETGEAR 
reseller for replacement.
5. 
Inspect the products and accessories for damage. Report any damage immediately.
Installation 
Install the equipment in the sequence presented in this section:
1. 
Select a location. See 
2. 
3. 
4. 
Note:  
This equipment is intended to be installed and used in a location 
other than home, school, or a public area accessible to the general 
population.