Netgear M5300-28G-POE+ (GSM7228PSv1h2) - 12-Port Managed Gigabit Switch Hardwarehandbuch

Seite von 32
Hardware Installation
13
 NETGEAR Managed Stackable Switch M5300 Series
Install the Switch
You can install the switch on a flat surface or in a standard 19-inch rack.
Install the Switch on a Flat Surface
The switch ships with four self-adhesive rubber footpads. Stick one rubber footpad on 
each of the four concave spaces on the bottom of the switch. The rubber footpads 
cushion the switch against shock and vibrations. 
Install the Switch in a Rack 
Note:  
You need the 19-inch rack-mount kit supplied with your switch.
To install the switch in a rack: 
1. 
Attach the supplied mounting brackets to the side of the switch. 
2. 
Use the provided Phillips head screws to fasten the brackets to the sides of the 
switch.
Mounting
bracket
3. 
Tighten the screws with a No. 1 Phillips screwdriver to secure each bracket. 
4. 
Align the bracket and rack holes. Use two pan-head screws with nylon washers to 
fasten each bracket to the rack. 
5. 
Tighten the screws with a No. 2 Phillips screwdriver to secure the switch in the rack.