Rohde & Schwarz Inc NV830X Benutzerhandbuch

Seite von 133
Chapter 8
Service
2098.0188.72
- 8.16 -
E-1
Fig. 12
Removing R&S NetCCU800 from transmitter rack
1) Captive screws at front panel of installed units (here: exciter and R&S NetCCU800)
2) Screws securing R&S NetCCU800 to rackmount
3) Guide rails
4) Support bracket for R&S NetCCU800
5) Safety lever for releasing guide rail catch
6. Undo the two fastening screws (Torx screwdriver No. 9) from the rackmount on both
sides of the R&S NetCCU800. 
Note
Removal should be performed by two persons. When pulled out by the handles, the R&S
NetCCU800 must be supported from below as soon as the support brackets no longer
support it. 
7. Pull the R&S NetCCU800 out of the rackmount.
5.1.2
Preparing R&S NetCCU800 for Installation
The replacement R&S NetCCU800 is delivered as a desktop unit and must be prepared for
installation as follows.
 Remove the protective rubber caps on the rear feet of the instrument.
The replacement unit is as a rule preconfigured with the default configuration. So that the
new R&S NetCCU800 does not adversely affect the operation of the transmitter when it is
put into operation in the transmitter rack, it must first be configured specifically for the trans-
mitter.