Trane Gas Unit Heaters Wartungshandbuch

Seite von 43
Installation: Piping
GKND-SVX01B-EN
21 
Installation: Concentric Vent 
Terminal
Horizontal Termination
Select a location on an outside wall for the vent terminal. 
In most applications, the terminal should be on level with 
the flue outlet of the unit, less 1/4 inch per foot pitch for 
condensate drainage toward the outside of the building 
(see 
Figure 11.
Vertical intake/vent installation
Figure 12.
Vertical vent installation
Figure 13.
Horizontal intake/vent locations
Figure 14.
Horizontal vent installation
WARNING
Hazardous Service Procedures!
The maintenance and troubleshooting procedures 
recommended in this manual could result in exposure 
to electrical, mechanical or other potential safety 
hazards. Always refer to the safety warnings provided 
throughout this manual concerning these procedures. 
When possible, disconnect all electrical power 
including remote disconnect and discharge all energy 
storing devices such as capacitors before servicing. 
Follow proper lockout/tagout procedures to ensure the 
power can not be inadvertently energized. When 
necessary to work with live electrical components, have 
a qualified licensed electrician or other individual who 
has been trained in handling live electrical components 
perform these tasks. Failure to follow all of the 
recommended safety warnings provided, could result in 
death or serious injury.