Electrical Requirements
M414905
44
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
Jumper Configuration Instructions
Changing the transformer configuration jumper is 
required, PRIOR TO SUPPLYING POWER TO 
THE MACHINE, if any of the following apply:
IMPORTANT: Failure to install the proper 
configuration jumper may result in damage to 
sensitive electronic controls and may void 
warranty.
You have 200 – 208 Volt service and are 
connecting a model rated for 240 Volt operation.
Replace the 240 Volt jumper with the 208 Volt 
jumper per the conversion label, located on the 
rear of the tumbler, sign and date conversion 
label to document the conversion.
You have 400 – 415 Volt service and are 
connecting a model rated for 380 Volt operation.
NOTE: CE electro-mechanical timer models (MT, 
RT and CD control suffixes) do NOT require 
conversion jumper.
Replace the 380 Volt jumper with the 415 Volt jumper 
per the conversion label, located on the rear of the 
tumbler, sign and date conversion label to document 
the conversion.
Ferrite Ring Installation 
Gas and Steam OPL Control Models Only
The ferrite ring provided in the literature packet must 
be installed over the power leads during connection of 
electrical service. The ferrite protects the sensitive 
electronic controls from destructive electrical 
disturbances which may be present on power lines to 
the machine. Failure to properly install the ferrite ring 
may result in damage to the electronic controls and 
will void control warranty.
To install:
1. Immediately after connection of power leads and 
before applying power to machine, locate each of 
the incoming service leads including ground.
2. Snap the ferrite ring closed over all the service 
leads inside of the contactor box as shown. It is 
important that the ferrite ring be installed inside 
the contactor box. Refer to Figure 22. Do not 
install the ferrite outside of the box or other area. 
Make sure that service leads are in the center of 
the ferrite before closing the ring so as not to 
pinch or damage leads.
Figure 22 
T225S
1
Ferrite Ring
2
Contactor Box
3
Jumper
1
2
3