Enviro Ascot User Manual

Page of 40
21
Initial Installation
24" (610mm)
Maximum
Horizontal
24" (610mm)
Minimum
Vertical
Inside
Finished
Collar
Wall
Thimble
Horizontal
Vent
Termination
Exterior
Wall Surface
Insulation
Interior Wall
Surface
If installed on a
carpeted surface
a hearth is required
Interior
Wall Surface
2.5"
(64mm)
Inside
Finished
Collar
Horizontal
Vent Section
Exterior
Wall Surface
Horizontal
Vent
Termination
Wall
Thimble
Insulation
If installed on a
carpeted surface
a hearth is required
NOTES:  
(1)  
The  horizontal  run  of  vent  pipe  must 
be  level  and  should  have  a  1⁄4”  rise 
for  every  one  foot  of  run  towards 
the  termination.  Never  allow  the 
vent to run downward. This could cause 
high  temperature  and  may  present  the 
possibility of a fire.
(2)  The  location  of  the  horizontal  vent 
termination on the exterior wall must not 
be  easily  blocked  or  obstructed.  Refer 
to  I
NITIAL
  I
NSTALLATION
  -  V
ENT
  T
ERMINATION
 
R
ESTRICTIONS
.
(3)  When  installing  a  vent  pipe  in  a  chase 
the minimum clearance to combustibles 
is 2” (51 mm).
NOTE:  Vent  pipe  must  not  be  longer 
than  18”  (457  mm)  maximum  when 
installing straight through exterior wall.
Maintain  manufacturer’s  clearances  to 
combustibles with venting.
Vent may extend between 6” (152 mm) 
and  18”  (457  mm)  maximum  straight 
out.
When installing this unit in a corner the 
maximum distance after 45˚ elbow is 9” 
(228 mm).
If between 9” (229 mm) and 24” (610 
mm), a 14” (356 mm) snorkel must be 
used.
Figure 26: Straight Through Wall Installation.
Figure 27: Up Then Through Wall Installation.