Dansons Group FPP Freestanding User Manual

Page of 40
 
Can
adian Comfort Industries      V04                                            
11                                                        
 PELPRO OWNERS MANUAL 
Copyright 2004                                                                     
www.pelprostoves.com
                                                        
Dansons Group Inc.
 
E
XHAUST 
S
YSTEMS
  
. . . Continued
 
 
PELLET VENT TERMINATION:
  (Figures 7 & 8) 
Termination must be a minimum of 6” above the chimney (B) (note: the chimney must meet local 
codes for height above the roof or other obstructions) 
Must have an approved cap (to prevent water from entering) or a 45* elbow downturn 
 
If the termination is located on a windy side of house, an approved house shield is recommended to 
prevent soot from accumulating on the side of the house. 
Must not be located where snow or other materials will plug it. 
Must have a “Metal Seal Plate”  or “Wall Thimble” at point (A) 
                                     Figure 7  
 
 
 
 
  Figure 8 
 
VENT TERMINATION CLEARANCES:
 
 
•  Horizontal terminations must protrude 12” from the wall, vertical terminations 24” 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
Figure 9 
 
 
A   
Minimum 4’ clearance below or beside any door or window which opens. 
B   
Minimum 1’ clearance above any door or window that opens. 
C    
Minimum 3’ clearance from any adjacent building. 
D    
Minimum 7’ clearance above any grade when adjacent to public walkways. 
                        NOTE: Vent may not terminate in covered walkway or breezeway. 
E    
Minimum 2’ clearance above any grass, plants, or other combustible material. 
F    
Minimum 3’ clearance from any forced air intake of any other appliance. 
G   
Minimum 2’ clearance below eves or overhang. 
H   
Minimum 1’ clearance horizontally from combustible wall
X   
Must be a minimum of 36” above the roof and 24” above the highest point of the roof within 10’. 
A
B
 
3’
10’
2’
x
A
A
F
G
4
12”