Heatiator BCDV36 User Manual

Page of 28
33606 Rev D
16
01-03
BUILDER'S CHOICE SERIES INSTALLATION INSTRUCTIONS
Figure 27
Standing Pilot Ignition Wiring Diagram
14-3 with Ground Romex is the recommended
wiring to the appliance Junction Box.
Detailed picture of the Junc-
tion Box (Optional for Stand-
ing Pilot Appliances).
4. WIRING
Standing Pilot Ignition - Millivolt System
a. Appliance Requirements
A wiring diagram is shown in Figure 27.
b. Wall Switch
The installer shall supply UL or in Canada, CSA-
listed  wall  switch  and  wiring  between  appliance
and  wall  switch.  This  appliance  was  tested  with
eighteen feet of UL Listed 18 ga. Type CL2 105°C,
two  conductor  “thermostat  wire.”  If  other  wiring
materials  are  used  they  shall  comply  with  local
codes  or  in  the  absence  of  local  codes,  with
National  Electrical  Code ANSI/NFPA  70-latest
edition or Canadian Electrical Code CSA C22.1.
c. Optional Accessories Requirements
Wiring  for  optional  accessories  should  be  done
now to avoid reconstruction.
5. JUNCTION BOX INSTALLATION AND
WIRING
Refer to the installation instructions included with the
JK9 Junction Box Kit and the insert of Figure 27.
Note: 
This  appliance  must  be  electrically  wired  and
grounded in accordance with local codes. In the absence
of local codes, the wiring must comply with the National
Electric  Code ANSI/NFPA  70  -  latest  edition  or  the
Canadian Electric Code CSA C22.1.
WARNING!
This standing pilot appliance does not require a 110V
AC power supply for operation. Connecting the appli-
ance/wall switch to a 110V AC will cause the appli-
ance to malfunction and destroy the valve and ther-
mopile.