Axor 39144XX1 User Manual

Page of 8
·     Install the outer sleeves to the hot 
and cold valves.  Measure each 
outer sleeve to a point 3/8” from 
the surface of the finished wall.  
Mark the sleeve at this point.  Cut 
the sleeves.   Install the inner 
sleeve.
·     The handle should be parallel 
to the floor.  If it is not, remove 
the handle.  Remove the handle 
insert, turn it slightly and replace.  
The handle should now be 
parallel to the floor.  
·     Measure the inner sleeve to a 
point 1⁄2” from the surface of the 
finished wall.  Mark and cut the 
inner sleeve at this point.  Place 
the handle over the inner sleeve.
·     Remove the handles.