Emerson Series 3000 MVD User Manual

Page of 348
186
Micro Motion
®
 Series 3000 MVD Transmitters and Controllers
Measurement Performance
Figure 21-2
Meter verification test, original version – Display 
21.3.3
Running Smart Meter Verification
To run a Smart Meter Verification test:
With ProLink II, see Figure 21-3.
With the display, see Figure 21-4.
With the Communicator, see Figure 21-5.
Note: If the custody transfer application is installed and the transmitter is secured, you can run a 
Smart Meter Verification test with outputs set to Continue Measuring or Fault. Last Measured Value 
is not available. See Section 19.3 for detailed information.
Note: If you start a Smart Meter Verification test from ProLink II or the Communicator, and the 
outputs are set to Last Measured Value or Fault, the transmitter display shows the following message:
SENSOR
VERFY/x
%
Start Meter Verify
Progress  . . . . . . . . . x%
PASS
ABORT
FAIL
Select
Set Uncertainty Limit
(1)
Maintenance Menu >
     Meter Verification >
Set output behavior
Proceed?
Yes
(1) Enter the uncertainty limit as a decimal value, 
e.g., 0.0400 (4%).