Honeywell R7426A User Manual

Page of 20
R7426A,B,C TEMPERATURE CONTROLLER WITH AND WITHOUT REAL-TIME CLOCK 
EN1B-0203GE51 R0507C 
 
WIRING 
Screwless type, spring loaded terminals are provided on 
the controllers for panel and field wiring. These terminals 
are suitable for solid conductors as well as tinned or with 
multicore cable end, stranded wires up to 1.5 mm
2
. To 
make a termination, push the wire into the terminal or insert 
a small screwdriver from the front of the controller into the 
spring-release hole and insert the wire. Check for proper 
connection by short pull on the wire. 
 
Table 1. Terminal Connection 
controller to CPA/SPA potentiometer 
R7426A,B,C  T7412B1016 
T7412B1057/1008 
T7412C1030/1006 
T7412B1024
T7412B1040
terminal 2 
terminal 4 
terminal 4 
terminal 4 
terminal 4 
terminal 5 
terminal 6 
terminal 5+6
R7426A,B,C  43193982-001 
terminal 2 
terminal 1 
terminal 4 
terminal 3 
 
Table 2. Wire Dimensions 
length max. 
wiring run 
type of 
wires 
1.0 mm
2
 
1.5 mm
2
 
from controller to all 
input and output 
devices 
local 
standard 
100 m 
150 m 
 
W303
 
Fig. 2. Parallel Connection of Compensation Sensor T3 
 
Table 3. Jumper States 
jumper
1)
 
state 
description 
closed 
T3 supplied by this controller 
W303 
open 
T3 supplied from another 
controller 
1)
 Default jumper position = closed. Cut (open) jumper W303 
only if the T3 input is fed from another controller (parallel 
connection, max. six devices). This disconnects the T3 input 
from the internal power supply 
 
Wiring should be done only according to the actual job 
wiring diagrams or wiring diagrams shown in the mounting 
instruction sheet EN1B-0202GE51. The wiring to the 
CPA/SPA potentiometers is described in Table 1. All wiring 
must conform to applicable codes, ordinances, and 
regulations. The maximum allowed wiring length per wire 
size are shown in Table 2. 
 
 
POWER SUPPLY AND GROUNDING 
1.  Refer to job drawings and verify correct supply voltage to 
transformer (230 Vac) and controller (24 Vac). 
2.  Connect line power conductors to transformer primary. 
Line power must be supplied from a breaker panel with 
dedicated controller circuit. Do not turn the line power on 
until all wiring has been checked against job drawings. 
3.  Connect transformers 24 Vac secondary to the controller 
terminals 18 and 19. Connect one conductor to terminal 
marked 24 V
∼ and the other to terminal marked 24 V⊥. If 
controllers are interconnected all terminals 19 must be 
connected to the same potential 24 V
⊥ level. 
4.  Do not connect the secondary side of the transformer to 
the installation ground.