Siemens 21-115532-001 User Manual

Page of 28
 
INTRODUCTION  
Page 2 
INSPECTION FOR 
STORAGE PRIOR TO 
DAMAGE IN SHIPMENT 
INSTALLATION 
Check each item with the shipping manifest immediately 
upon receipt of the regulator. Make a thorough visual in-
spection of the regulator. Check for evidence of damage 
attributable to mishandling in shipment. Should any short-
age or damage be found, notify the local agent of the carrier 
making the delivery and make appropriate notation on the 
freight bill. Any damage or shortage that is not noted on the 
freight bill becomes the recipients responsibility. A claim 
should be made immediately with the carrier. Please also 
notify your Siemens representative as soon as possible. 
Assure that the control compartment enclosure is tightly 
closed, and regulator tank is sealed.