Lucent Technologies Release 7 User Manual

Page of 2657
DEFINITY Enterprise Communications Server Release 7 
Maintenance for R7r  
555-230-126  
Issue 4
June 1999
Maintenance Object Repair Procedures 
9-1292
PMS-PRNT/JNL-PRNT (PMS Printer Link) 
9
System Technician-Demanded Tests: Descriptions 
and Error Codes
Always investigate tests in the order presented in the table below. By clearing 
error codes associated with the 
Link Retry Test, for example, you may also clear 
errors generated from other tests in the testing sequence.
Link Tear Down Test (#213)
This test is destructive.
This test disconnects the existing link between the system and the external 
printer device. If the link has been disconnected already, this test just returns 
PASS. All resources allocated for a PMS Printer Link are released after this test. 
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
1.
D = Destructive; ND = Nondestructive
Link Tear Down Test (#213)
X
D
Link Retry Test (#215)
X
X
ND
Table 9-508.
TEST #213 Link Tear Down Test 
Error 
Code
Test 
Result
Description/ Recommendation
40
ABORT
Internal system error.
50
ABORT
Internal system error.
1. Retry the command at one-minute intervals a maximum of 5 times.
1010
ABORT
The link has been busied out to out-of-service.
1. Enter release journal wakeup-log|pms-log command to release the link 
from busyout state.
2. Retry test journal wakeup-log|pms-log l command to execute the test.
2012
ABORT
Internal system error.
1. Retry the command at one-minute intervals a maximum of 5 times.
FAIL
Internal System error.
1. Retry the command at one-minute intervals a maximum of 5 times.
PASS
The link is torn down.